Padlocked item? Padlocked items are restricted to fully subscribed member organisations only. Please visit our about / join us page if you would like your organisation to be considered for University Design Forum membership.
See individual data sheets.
Building type/use:
University Class rooms and Model Workshop
Completion date:
May 2021
Internal floor area m2 (GIA):
Building A 1.280 m2
Building B 2.164 m2
Building C 1.130 m2
Parterre 6.000 m2
Building type/use:
School (university), departments, scientific laboratories (didactic and departmental), Library, offices.
Completion date:
December 31, 2025 + 180 days for testing
Internal floor area m2 (GIA):
sqm (GIA) from “Progetto Preliminare” (RIBA 2): 190.597m2
sqm (GIA) from “Progetto Definitivo” (RIBA 3): 210.476m2
(+ 19.879m2)
Building type/use:
Faculty and Staff offices, meeting rooms, the Aula Magna with the Exhibition Area, a cafeteria, a parking, a post office.
Completion date:
2008
Internal floor area m2 (GIA):
68,628 m2
Building type/use:
Student wellbeing, support and learning building
Project name:
Student life building
Practical completion date:
December 2019
Floor area (GIA):
2,825 m²
Padlocked items are restricted to fully subscribed member organisations only. Click here to join us
Building type/use:
Multi-functional
Completion date:
La Fabrica & Nau building – 28th October 2010 / Roc Boronat building – 28th October 2010 / Tallers area – 4th March 2010 / Tanger building – 11th January 2010
Internal floor area m2 (GIA):
La Fabrica building – 3,301.25 € / La Nau building – 1,867.98 € / Roc Boronat building – 14,912.54 € / Tallers area – 5,016.79 € / Tanger building – 8,878.27 €
Building type/use:
Multi-use
Project name:
Boldrewood Campus Masterplan
Practical Completion Date:
Final Phase 2019
Floor area (GIA):
Approx. 22.100 sqm (for new buildings only)
Building type/use:
Art and Design Centre in Barcelona
Project name:
Escola Massana. Art and Design Centre in Barcelona
Completion date:
2017 September
Internal floor area m2 (GIA):
10.050 m2
Building type/use:
Scientific infrastructure
Project name:
PRBB
Completion date:
15 May 2006
Internal floor area m2 (GIA):
55.000 m2
Building type/use:
Medical Research Institute
Project name:
Institut de Recerca de l’Hospital de la Santa Creu I Sant Pau
Completion date:
October 2018
Internal floor area m2 (GIA):
9705m2
Building type/use:
Education/Research
Project name:
Maersk Tower
Practical Completion date:
Building opened on 18 January 2017
Floor area (GIA):
42.700 m² (24.700 m² laboratories, offices and shared facilities and 18.000 m² foyer, canteen, auditoria, classrooms, plant)
Building type/use:
Student housing
Project name:
Tietgenkollegiet / The Tietgen Dormitory
Practical Completion date:
September 2007
Floor area (GIA):
26,500 m2
Building type/use:
Educational facility for multi-disciplinary fields related to information technology
Project name:
IT University
Practical Completion date:
2004
Floor area (GIA):
19,600 sqm
Building type/use:
Student Residence and Conference Centre
Project name:
Elm Grove Hall (Residences)/ Elm Grove (Conference Centre)
Practical Completion date:
September 2016
Floor area (GIA):
11,485 sqm
Building type/use:
Marine research/teaching
Project name:
Marine Building – BP100013-103
Practical Completion date:
June 2012
Floor area (GIA):
5740 sqm
Building type/use:
Multi-functional
Project name:
Roland Levinsky Building
Practical Completion date:
Opened in August 2007
Floor area (GIA):
13,464 sqm
Building type/use: Academic research areas: office areas and laboratories; lecture theatre and seminar spaces; Museum of Zoology – Galleries and exhibition spaces, specialist storage, education spaces, public cafe; Site wide distribution centre and Estates FM base
Project name:
The David Attenborough Building
Practical Completion date:
March 2016
Floor area (GIA):
13,405m2
Building type/use:
Mixed Use; Key Worker Residential Apartments, Foodstore, Retail, Health Centre, Energy Centre, Estates Office
Project name:
North West Cambridge Development Lot 1
Practical Completion date:
June 2017
Floor area (GIA):
19,792 sqm (includes basement car park)
Building type/use:
Education – science, research labs & industry outreach
Project name:
Maxwell Centre
Practical Completion date:
April 2016
Floor area (GIA):
5,000m²
Building type/use:
Education – Research / Offices
Project name:
Trinity Long Room Hub
Practical Completion date:
2010
Floor area (GIA):
1,500 sq.m.
Building type/use:
Educational – Library
Project name:
Usher Library
Practical Completion date:
2003
Floor area (GIA):
10,000 sqm
Building type/use:
Library and special archive; Lecture theatres and multi-use hall; Student services; Teaching rooms; Social learning space; Catering; Bar and lounge facilities; Gallery; School of Architecture, Planning and Real Estate + Construction
Project name:
John Henry Brookes and Abercrombie Building
Practical Completion date:
Sept 2012 (Phase 1) Jan 2014 (Phase 2) July 2014 (Phase 3)
Floor area (GIA):
24,320 m2
Building type/use:
Library / Learning Centre
Project name:
TU Delft Library
Practical Completion date:
The building was opened for students in January 1998
Floor area (GIA):
15.158m2
Building type/use:
Education – Office, Entertainment, Catering, Gym, Students’ Union, Faith Centre
Project name:
Saw Swee Hock Student Centre
Practical Completion date:
December 2013
Floor area (GIA):
6,101 sqm
Building type/use:
202 bedroom hotel with restaurant, bar, meeting rooms, large atrium space outdoor terraces and executive lounge.
Project name:
Orchard Hotel
Practical Completion Date:
8th November 2012
Floor area (GIA):
9,510 sqm
Building type/use:
Teaching and learning centre, including seminar rooms of varying sizes, graduate school and large open access computer room.
Project name:
Engineering & Science Learning Centre
Practical Completion Date:
June 2011
Floor area (GIA):
3,551 sqm
Above photograph by courtesy of Hufton and Crow ©
Building type/use:
Seminar rooms, lecture theatre, student services, learning laboratories, retail area, Central amenity/performance/ gathering space, University Reception, Bank, coffee bar, Refurbishment of library and catering areas.
Project name:
The Forum
Practical Completion date:
April 2012 (main works)
Floor area (GIA):
8050 sqm (new build), 6200sqm (refurbishment)
Building type/use:
Art & Design College
Project name:
King’s Cross
Practical Completion date:
August 2011
Floor area (GIA):
43,960 m2
Building type/use:
Sports Facility
Project name:
Aberdeen Sports Village
Practical Completion date:
19 June 2009
Floor area (GIA):
18,327